In this open-access platform, you can access all the information collected during and beyond the end of the project. The platform provides more information for self-learning educational.

REGULATIONS TECHNICAL DOCUMENTS MULTIMEDIA CARDS BIM OBJECTSDISSEMINATION
Name and description Uploaded by Language available Date
2.1 Multimedia Cards CTMSeptember 2020
IT production of BIMstone Multimedia Cards
2.1 Multimedia Cards CTMNovember 2021
Producción de tarjetas multimedia BIMstone
2.1 Multimedia Cards DNVNovember 2021
Erstellung von BIMstone Multimedia Cards
2.1 Multimedia Cards KSKNovember 2021
IT izrada BIMstone Multimedijskih kartica
2.1 Multimedia Cards RoGBCNovember 2021
Producere IT de Carduri Multimedia BIMstone
Animation 1 CTMAugust 2021
Procedure for the placement of stones in ventilated slate roofs.
Animation 2 CTM August 2021
Procedure for the placement of marble or granite in inclined roofs.
Animation 3 CTM August 2021
Procedure for the placement of natural stone in ventilated facades.
Animation 4 CTM August 2021
Procedure for the construction process of a technical or floating floor with natural stone slabs.
Animation 5 CTM August 2021
Procedure for the construction process of an exterior pavement placed without mortar.
Animation 6 CTM August 2021
Procedure for the construction process of an interior pavement placed without mortar.
Animation 7 CTM August 2021
Procedure for the traditional construction process from Croatia of an inclined roof.
Animation 8 CTM August 2021
Procedure for the construction process of a façade with large-format ashlars of natural stone.
Animation 9 CTM August 2021
Procedure for the construction process of a pavement of pavers on sand bed.
Animation 10 CTM August 2021
Procedure for the construction process of a pavement over an existing previous pavement.